School Reception Refurbishment AGS10
School Reception Refurbishment AGS2
School Science Laboratory Refurbishment Watford Grammar School3
School Laboratory Refurbishment Kingston5
School Science Laboratory Refurbishment Chelmsford School4
School Teaching Wall Kingston1

2021 PROJECTS

School Reception Refurbishment AGS10.jpg
AGS.png
Aylesbury Grammar School
Reception Area

 

As part of a large construction project which re-modelled the main entrance to the school, Shield were asked to design and deliver a fully functioning new reception area which would give visitors a fantastic first impression.

 

We produced several drawings including a number of 3D renders which helped the school team visualise our designs.  We fitted a bespoke reception desk, feature lighting a unique display case and a large, glazed glass ‘box’ which formed a secure foyer to the entrance of the building.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
School Science Laboratory Refurbishment Watford Grammar School14.jpg
watford-boys-grammar-logo B_w.png
Watford Grammar School
Science Laboratories

 

We were asked to replace existing furniture in two laboratories.  We designed bespoke student islands which allowed for all services to run the length of the islands, providing gas, water and electricity to all students whilst retaining a forward-facing position within the classroom.

 

We installed new teachers desks with the provision of all services thus allowing for full practical demonstration in front of the whole class.  All base units were finished in light grey and worktops in Trespa Ice Blue.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
School Laboratory Refurbishment Kingston1.jpg
Kingston-Grammar-logo.gif
Kingston Grammar School
Science Laboratories

 

We refurbished an existing laboratory and converted two adjacent classrooms into a new laboratory space.  We completed a full rip-out of the existing rooms and removed an internal dividing wall.  We ‘Diamond drilled’ the floor to provide new services to the room, installed a full air exchange system with new ductwork, new flooring, and a suspended ceiling with energy efficient LED lighting.  Both rooms were fitted with bespoke student and teacher desking systems.  Gas taps, electrical sockets and sinks and taps were fitted within all student and teacher desks.  All base units were finished in Graphite grey and Velstone worktops fitted throughout.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
School Science Laboratory Refurbishment Chelmsford School1.jpg
Chelmsford Logo.png
Chelmsford County High School
for Girls - Science Laboratories

 

As part of the construction of a new build science block, Shield were asked to design, supply and install all new furniture for four new laboratories and two preparation rooms.  We designed a unique island ‘pod’ which was fixed to the floor, this allowed for the provision of gas and electrics to run up to counter mounted taps and sockets.  Student desking was designed to fit around these pods, creating some flexibility of layout within each classroom. 

 

Full perimeter units were installed including fireclay sinks and Broen laboratory taps.  Bespoke teachers desks with integrated gas, sinks and electrical sockets were installed in each room allowing for full practical demonstrations in front of the whole class.  In each prep room we installed full height shelving, fixed wall units and new technician desking.  All units were finished in Graphite grey with Velstone ‘Silver Dust’ worktops throughout.

 

To help the client visualise the new layouts, we produced both 2D and 3D images and  detailed 3D technical drawings of the bespoke pod system.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
School Teaching Wall Kingston7.jpg
Kingston-Grammar-logo.gif
Kingston Grammar School
– The Nutting Room

 

We were asked to convert an existing changing / shower room block into a new classroom.  We conducted a full rip out, including demolishing existing internal walls and blocking doorways to create a single room.  We installed a full air handling system, new flooring, suspended ceiling with new LED lighting and decorated throughout.

 

We designed a bespoke teacher wall to span the width of the room allowing for flexible storage with integrated white boards and interactive digital screen.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
ctbreeze_20210903_AQ9A1777.jpg
PalmerAcademyLogob_w.png
The Palmer Catholic Academy
– Food Technology

 

We completely re-modelled and refurbished an existing Food Technology classroom which facilitated an increase in students able to access the space and allowed for more practical, teacher led demonstrations to take place within the room. 

 

We completed an initial rip-out of all existing appliances and furniture.  This included removing internal walls and bracing the ceiling with new structural timbers.  We laid new flooring, installed a suspended ceiling, introduced a full air handling system and fully decorated throughout.

 

We installed new units throughout the room by introducing workstation ‘islands’ around the perimeter. This layout allows a pair of students to have access to an oven, hob, sink and additional power.

 

We installed a new bespoke teachers desk complete with hob / oven, dedicated sink and electrical sockets.

To play, press and hold the enter key. To stop, release the enter key.

press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom
press to zoom